AWE: Waitsia-3 elevated gas shows encountered Martin Kovacs, 19 Jun 2017

AWE, operator of L1/L2 in the Western Australian northern Perth Basin, has reported that all primary and secondary targets have been intersected at the Waitsia-3 well, with elevated gas shows “encountered in multiple zones within the Kingia and High Cliff intervals”, the significance of which will be evaluated by wireline logs.

Three sections of core were cut: Core #1, from 3,206–3,232 m MDRT, Core #2, from 3,232–3,251 m MDRT, and Core #3, from 3,251–3,282 m MDRT, AWE advised, with all cores having been sent for analysis.

AWE advised that Waitsia-3 was at 3,578 m MDRT, with it drilling ahead to a planned total depth of 3,706 m MDRT.

comments powered by Disqus